14-14 营业铁路基本情况 LENGTH OF RAILWAYS IN OPERATION -------------------------------------------------------------------------------------------------------------- | | | | | | 项 目 Item | 1978 | 1985 | 1990 | 1993 | 1994 | 1995 | | | | | | --------------------------------------------------------------+-------+-------+-------+-------+-------+------- 营业里程 (公里) Railways in Operation (km)| 48618 52119 53378 53802 53992 54616 正式营业 (公里) Formal Operation (km)| 45539 49433 50310 50687 50759 50866 临时营业 (公里) Temporay Operation (km)| 3079 2686 3068 3116 3233 3750 正式营业里程比重 (%) Percentage of Formal Operation | 93.7 94.8 94.3 94.2 94.0 93.1 复线里程 (公里) Double Track of Railway Length (km)| 7630 9989 13024 14315 15475 16909 占营业里程比重 (%) As Percentage of Railways in Operation| 15.7 19.2 24.4 26.6 28.7 31.0 电气化线路里程 (公里) Electrified Railways (km)| 1030 4151 6941 8935 8966 9703 占营业里程比重 (%) As Percentage of Railways in Operation| 2.1 8.0 13.0 16.6 16.6 17.8 内燃机牵引线路里程(公里) Diesel Engine Routes (km)| 6550 10822 16097 19237 20692 24749 占营业里程比重 (%) As Percentage of Railways in Operation| 13.5 20.8 30.2 35.8 38.3 45.3 调度集中里程 (公里) Centrally Controlled Routes (km)| 1307 1169 1325 1114 1226 占营业里程比重 (%) As Percentage of Railways in Operation| 2.5 2.2 2.5 2.1 2.2 自动闭塞里程 (公里) Automatic Switching Routes (km)| 5981 6921 10370 12200 12613 12910 占营业里程比重 (%) As Percentage of Railways in Operation| 12.3 13.3 19.4 22.7 23.3 23.6 半自动闭塞里程 (公里) Semi-Automatic Switching Routes (km)| 34759 42625 38832 40743 40607 40859 占营业里程比重 (%) As Percentage of Railways in Operation| 71.5 81.8 72.7 75.7 75.2 74.8 无缝线路里程 (公里) Seamless Track Routes (km)| 6530 10439 14644 18943 20093 21854 占正线里程比重 (%) As Percentage of Main Track Railways | 12.2 16.7 21.7 35.2 37.2 40.0 有电气集中的车站 (个) Electrified Stations (unit)| 1336 2320 3535 4194 4385 4587 占营业车站比重 (%) As Percentage of Railways Stations | 27.7 46.9 62.9 73.9 73.9 73.9 in Operation | --------------------------------------------------------------------------------------------------------------